When proceeding with new construction, please be aware that the District does require all of the following:
- A site plan to include the size and location of new construction and existing structures on the site, septic systems and well, distances from lot lines, distance from County regulated drains or tiles and it shall be drawn in accordance with an accurate boundary line survey.
- Building plans to include floor plans, exterior elevations, plumbing… sufficient details to show all construction.
Once all required information is received by the District, the Permit Clerk will perform a site check. If the new construction will not interfere with any portion of the SLRWD/septic system, a letter of non-objection will be issued. Please see the permit checklist below.
Please be aware that it may take 48-72 hours (2-3 Business days) to complete the process. For any further questions, please contact the District staff.
Planning a Project?
If planning a project, please contact us 48 hours before visiting the office to reduce your wait time. You may also email the plans ahead of time to mburris@slrwd.org.
Applying for a Variance?
If you are applying for a variance with the Building Department and a variance is required, this is the form you have to fill out. The bottom section is filled out by our staff indicating we have no issues with the necessary variances.
Permit Fees
Excerpt from Rate Ordinance 2012-02 Adopted May 10, 2012
Section 6. For the inherent costs associated with non-objection letters and inspections, the following fee schedule is adopted. Such fees shall be payable as hereinafter provided and in an amount determined as follows.
Residential:
- New dwelling constructions; Additions to existing dwellings; Unattached garages, accessory or storage buildings connected to system; Manufactured homes not located in a mobile home park.
This fee includes four (4) trips to the building site.
Fee: $100.00 - Unattached garages, accessory or storage buildings not connected to system; Decks, porches, carports, fences, retaining walls, or similar type construction, manufactured home located in a mobile home park (a letter is required from the co-op manager or mobile home park owners).
These items include one (1) trip only to the building site.
Fee: $30.00
Commercial:
- New construction, additions
Fee: $100.00 - If a non-objection letter/amendment is required by other agencies not covered above and does not require a site inspection, there will be a minimum charge of $10.00 per letter.
Renewal of expired letters of non-objection is $10.00 if no changes are made to original submitted drawings or no new trips have been for re-inspection. - One Trip:
- Inspection of tank, plumbing and electrical: $30.00
- Electrical only: $30.00
- Plumbing only: $30.00
- Re-inspection fees will be charged per trip: $30.00
- Post-construction permit double the cost of original permit fee